Les registres des risques sont morts. Vive le graphique des risques.

For years, the humble risk register has been the centerpiece of enterprise risk management. A tidy list of risks, each scored and categorized, often living in a spreadsheet or static GRC module. It’s familiar. It’s structured. It’s… outdated.

Let’s be real: the modern enterprise doesn’t manage risk in rows.
It lives in relationships – between processes, controls, incidents, third parties, business units, and regulatory frameworks.

That’s where the risk graph comes in.

What’s Wrong With the Risk Register?

Don’t get us wrong, registers have their place. But too often, they’ve become bloated inventories rather than useful tools. They tell you what your risks are, but they don’t tell you:

  • How risks relate to controls
  • How incidents impact multiple areas
  • Which business units are most exposed
  • How regulatory requirements map to operational processes

Registers are static. Risk isn’t.

The Risk Graph: Context Is Everything

A risk graph is a dynamic, connected model of your risk universe. Instead of flat lists, it shows relationships — between risks, processes, controls, incidents, audit findings, KRIs, and more.

It’s not just prettier. It’s more powerful.

With a risk graph, you can:

  • See cascading impacts when a control fails
  • Understand how a single risk ties into multiple frameworks
  • Trace incident root causes back to process gaps or third-party failures
  • Prioritize action based on actual interconnected exposure, not just risk score

Think of it as the difference between reading a cast list and watching the entire show unfold. A risk register says “these are the players.” A risk graph says “here’s how they interact, and here’s where things could go wrong.”

The Problem With Managing Risk in Silos

Flat registers encourage siloed thinking. Risk lives in one tab. Controls in another. Audits, incidents, and vendors? Separate systems entirely.

This is a problem.

Real risk doesn’t respect silos. A control failure in IT could impact financial reporting. A vendor issue could trigger compliance risks and reputational harm. Unless your platform reflects these relationships, you’re just playing whack-a-mole.

Connected Risk Is the Future, And It’s Already Here

At Empowered, we’ve been building Connected Risk from the ground up to support this exact vision. Our platform doesn’t just capture risks, it connects them. We help you build a living, breathing risk graph where everything links together:

  • Risks tie to controls, owners, processes, policies, and audits
  • Incidents automatically inform risk exposure and treatment
  • Third-party risks feed into enterprise risk assessments
  • Dashboards reflect the real web of your environment, not just a filtered table

This isn’t theory. It’s happening in real deployments with real teams that are tired of managing risk reactively.

TL;DR

Risk registers helped us walk. Risk graphs help us run.

If your risk management program is still spreadsheet-driven or locked in a flat GRC module, it’s time to upgrade to a system that shows you the bigger picture.

Risk isn’t linear. Your platform shouldn’t be either.

Cet article vous plaît ?

Courriel
Partager sur Facebook
Partager sur LinkedIn
Partager sur XING

Parler à un expert

"Les champs obligatoires sont indiqués par un astérisque(*)

Ce champ est utilisé à des fins de validation et ne doit pas être modifié.
Vous cherchez du soutien ?

Si vous recherchez une assistance produit, veuillez vous connecter à notre centre d'assistance en cliquant ici.

Tout d'abord, quel est votre nom ?*

Soumettre une demande de prix

"Les champs obligatoires sont indiqués par un astérisque(*)

Ce champ est utilisé à des fins de validation et ne doit pas être modifié.
Tout d'abord, quel est votre nom ?*

Soumettre une demande d'appel d'offres

"Les champs obligatoires sont indiqués par un astérisque(*)

Ce champ est utilisé à des fins de validation et ne doit pas être modifié.
Tout d'abord, quel est votre nom ?*
Quelle est la solution pour laquelle votre appel d'offres demande une réponse ?*
Déposez vos fichiers ici ou
Types de fichiers acceptés : pdf, doc, docx, Taille maximale du fichier : 1 MB, Nombre maximal de fichiers : 4.
    Skip to content